{"id":13103,"date":"2026-04-28T18:14:53","date_gmt":"2026-04-28T18:14:53","guid":{"rendered":"https:\/\/dailyechoes.ng\/?p=13103"},"modified":"2026-04-28T18:17:23","modified_gmt":"2026-04-28T18:17:23","slug":"fubara-inspects-three-phase-creekroad-market-project-sets-completion-date-for-january-2027","status":"publish","type":"post","link":"https:\/\/dailyechoes.ng\/index.php\/2026\/04\/28\/fubara-inspects-three-phase-creekroad-market-project-sets-completion-date-for-january-2027\/","title":{"rendered":"Fubara Inspects Three-phase CreekRoad Market Project  ..Sets Completion Date for January 2027"},"content":{"rendered":"<p>By George Mgbeleke <\/p>\n<p>Governor  of Rivers State, Sir Siminalayi Fubara, on Tuesday, inspected the ongoing construction work at the Creek Road Market, Port Harcourt, declaring that the project will be completed by January 2027. <\/p>\n<p>The new market,  which is divided into three sections is  designed to provide a decent and more conducive  environment for traders  who had for many years extended their  buying and selling activities to the road due to congestion in the old  market.<\/p>\n<p>The governor was conducted round the project site by Architect Opiribo West, the site engineer for E.S.T Masters Construction, the firm handling the project, alongside Hon. Tonye Belgam, the State Commissioner for Special Projects. <\/p>\n<p>Addressing newsmen at the end of the inspection tour, Governor  Fubara explained that the reconstruction of the market  was borne out of the  need  to provide adequate space for the traders and  clear the surrounding  roads of the spillover from the market. <\/p>\n<p>He noted that the ongoing rehabilitation of the network of roads in the old Port Harcourt  Township  had been significantly hampered by the lack of a modern  market, stressing  that the new market will be a promise kept and   part of the high-quality infrastructure and urban renewal  programme of his administration. <\/p>\n<p>&#8220;You are aware that we did promise our people  that all the roads in town will be fixed. But we had a very serious issue because of the Creek Road section of the township  roads . Because of not having adequate  space  to accommodate the traders in the market,  they extended their activities into the road and  that became a serious issue for our construction work. <\/p>\n<p>&#8220;So we decided that for us to deliver a better project that would impress our people,  we must, as a matter of fact, embark on building a better and more  comfortable market for our people,&#8221; he said. <\/p>\n<p>Governor Fubara explained that while construction work has begun in<br \/>\nSection A  of the market, Section B  is being  prepared for immediate commencement of construction while   Section C  will require a more rigorous engineering approach because of it&#8217;s location on a borrow pit. <\/p>\n<p>&#8220;As  you are aware,  we&#8217;ve been here once to check the activities of the contractor. Today, I&#8217;m here to see for myself the extent of work that is ongoing. And I feel very happy that they are doing a very good job. <\/p>\n<p>&#8220;They just informed me that the market is divided into three  sections. The section A and the section B and the section C. The A is the one we just saw here that they&#8217;ve already started from the ground. This B section is the other side which they will start  soon, while the C section is the one that they discovered that it was a borrow pit.<\/p>\n<p>&#8220;And you know, you can&#8217;t build on top of a borrow pit. So we had to do evacuation and filling. So I believe that once those things are done, the other part of the section of the market will also commence. They even assured me that the timeline I gave to them for January that they are going to deliver the project fully for our people to use,&#8221; he said.<\/p>\n<p>Governor Fubara emphasised that the  investment in a modern market  is an integral part of his administration&#8217;s  agenda  on good governance through the  delivery  of legacy projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>By George Mgbeleke Governor of Rivers State, Sir Siminalayi Fubara, on Tuesday, inspected the ongoing construction work at the Creek Road Market, Port Harcourt, declaring that the project will be completed by January 2027. The new market, which is divided into three sections is designed to provide a decent and more conducive environment for traders [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":13104,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[4787,4326],"class_list":["post-13103","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-hampered","tag-significantly"],"_links":{"self":[{"href":"https:\/\/dailyechoes.ng\/index.php\/wp-json\/wp\/v2\/posts\/13103","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dailyechoes.ng\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dailyechoes.ng\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dailyechoes.ng\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/dailyechoes.ng\/index.php\/wp-json\/wp\/v2\/comments?post=13103"}],"version-history":[{"count":1,"href":"https:\/\/dailyechoes.ng\/index.php\/wp-json\/wp\/v2\/posts\/13103\/revisions"}],"predecessor-version":[{"id":13105,"href":"https:\/\/dailyechoes.ng\/index.php\/wp-json\/wp\/v2\/posts\/13103\/revisions\/13105"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dailyechoes.ng\/index.php\/wp-json\/wp\/v2\/media\/13104"}],"wp:attachment":[{"href":"https:\/\/dailyechoes.ng\/index.php\/wp-json\/wp\/v2\/media?parent=13103"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dailyechoes.ng\/index.php\/wp-json\/wp\/v2\/categories?post=13103"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dailyechoes.ng\/index.php\/wp-json\/wp\/v2\/tags?post=13103"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}